What is done, with dates
Project log
This is where we record each milestone as it happens, with its date. Only what has been built or measured: no announcements, no projections.
Follow the pilot programPublic counter and case studies
Two pilot kiosks have been in service in Togo since November 2026. We will publish a counter of litres dispensed here, followed over the program by case studies with real figures: availability, volumes, revenue, repair times.
The first figures will be published here as soon as the first unit is installed.
-
Pilot program and website open
The pilot program is open to NGOs, municipalities and operators, with this website to apply and book a conversation.
-
Water section of the prototype validated
The part of the kiosk that the water flows through has passed our tests.
-
A kiosk designed for easy servicing
The kiosk is designed so a technician can work on one part without taking the rest apart.
-
Per-cubic-metre tariff and automatic app updates
Tariffs are now expressed per cubic metre, like the sector's reference prices. The operators' app updates itself remotely, and every update is secured.
-
Running on battery alone
Observed in the workshop: the board boots and runs on its battery with no mains connection at all.
-
Water dispensed to the litre
The kiosk anticipates how the tap opens and closes, to dispense exactly the volume paid for.
-
Production circuit board received
The production-run circuit board arrived.
Further reading
Let's talk about your water point
Discovery call, demo or pre-order: the form points you to the right option in under two minutes.
Reserve my stationNo payment or commitment during the testing phase.